Data centre hardware supply

Servers, storage, switching and rack infrastructure sourced to specification, for build-outs and capacity expansion.

Submit your requirement

Please enable JavaScript in your browser to complete this form.

OR

Have a full BOQ or spreadsheet? Upload it through the main quotation form instead.

— The requirement

Configuration detail decides whether the quote is usable

Server quotations go wrong in the detail: the wrong rail kit, a PSU that does not match the rack feed, a backplane that will not take the drive count you planned, memory populated in a configuration that halves the bandwidth.

Send the full configuration or the workload and the constraint and the quotation will come back with the part-level detail, not a headline model number that turns out to need three additional line items.

What we supply

Procurement benefits

— Recommended for this sector

Typical configurations

TIER 01

Compute

1U/2U rack servers configured for the workload — CPU, memory topology, drive count and network cards.

TIER 02

Storage

NAS or SAN with a drive plan, spares and the controller configuration stated.

TIER 03

Network & power

Switching, transceivers, firewalls, PDUs and UPS sized to the rack.

— Recommended for this sector

Before you send the requirement

Can you quote from a bill of materials?

Yes upload the BOM through the quotation form and it will be quoted line by line.

Do you supply transceivers and cables with switches?

They are quoted as separate lines because compatibility depends on the switch model and distance. Ask and they will be included.

What are typical lead times on server hardware?

It varies by configuration and is stated per line in the quotation rather than promised generally.